Tuesday, February 16, 2016

Spring semester

In this semester, we will need to build our project out. During the first meeting, we were told to build at least 5 vehicles instead of 10 due to the budget. We have finalized the bogie design and will send the drawings for fabrication soon. The cabin design is still on the way because we would like it to be built 3 pieces. We will finalize the design as soon as possible so that we will have more time for testing later in the semester.

No comments:

Post a Comment